Charging an electric vehicle at a house is a matter of an electrician and a wall box. In an apartment building it is a shared-infrastructure question. The car park is usually common property or an accessory unit, the power supply is shared, and any change to either needs agreement from people who may never plan to own an EV. There is no single national rule that decides it, so the process runs through the body corporate.
The Unit Titles Act 2010 sets out how a body corporate is run and how decisions are made. The current consolidated text on legislation.govt.nz does not contain provisions specific to electric vehicle charging, so charger requests are handled by the general rules: the body corporate's powers over common property, its operational rules, and the voting thresholds for decisions.
The government's unit titles guidance gives the key principle. An owner can make improvements within their unit boundary, as long as they do not affect the common areas or other units and they follow the body corporate rules. If the work will affect another unit or the common property, you must tell the body corporate and get written consent from it and any affected owners. A charger bolted to a basement wall, a cable run along a common ceiling or a new circuit from the building's main switchboard falls on the common property side of that line.
A related example in the unit titles healthy homes guidance shows how this plays out for external equipment. A landlord wanting to put a heat pump outside a unit found that the body corporate's rules prohibited external units on shared property without consent, so the landlord had to take all reasonable steps to get that consent. EV chargers are a similar kind of request.
Body corporate decisions are called resolutions. Most are ordinary resolutions, which need more than 50 percent of votes cast. Some need a special resolution at 75 percent. Each principal unit has one vote, and owners with unpaid levies cannot vote. Which threshold applies to a charger proposal depends on what is being proposed, whether that is a single owner's wall box, a shared charging bay or a building-wide electrical upgrade, so it is worth asking a body corporate manager or lawyer before the meeting rather than after it.
Operational rules are the other lever. The guidance on setting rules says rules must relate to the management, use or enjoyment of units and common property, and any change has to be lodged with Land Information New Zealand to take effect. Rules about who can install what, who pays for electricity and how bays are allocated are all things a committee could consider once the first request arrives. Another option is to adopt a rule or policy in advance, so every owner is treated the same way.
Committees must produce an agenda and keep minutes of their meetings, and minutes have to reach all owners within one month. If you are asking for a charger, put the request in writing so it appears on an agenda rather than being raised in passing.
The Strata Community Association (New Zealand), the industry body for body corporate managers, set out the recurring questions in a submission on the government's draft EV charging strategy. They come down to:
The same submission points out that bodies corporate decide for the whole property and may default to refusing individual requests because of cost, capacity or fairness concerns, even when the owner offers to pay. It also describes a first-in, best-dressed risk where early installers use up spare electrical capacity and later residents miss out. Both are worth bearing in mind when you frame a request: a proposal that deals with capacity and fairness up front is easier to approve than one that does not.
Electrical capacity is the technical hinge. The SCA submission notes that most households only need a 7 kW charger for typical daily driving and that higher-powered units put more load on the building's supply. It also advocates smart charging, which manages charging based on demand, other vehicles being charged and local generation, as a way of making shared supply work for a multi-unit building.
An electrician or electrical engineer should assess the building's incoming supply, switchboards and spare capacity before any installation is agreed. For general guidance on home charging, Standards New Zealand makes the publicly available specification SNZ PAS 6011:2023 on residential EV charging free to view. It was prepared by industry, engineering, transport, energy retail and regulatory representatives and covers installing a charging station, charging safely and cost-effectively, and smart charging. It was written with homeowners in mind rather than apartment buildings, so treat it as background and not a substitute for building-specific advice.
The submission also lists fire safety and insurance as issues for unit-titled properties. Raise both with the building's insurer before work starts, since the body corporate carries the principal insurance policy over the buildings, according to the unit titles guidance on finances.
The SCA submission says retrofitting unit-titled buildings can be expensive and gives an indicative figure of at least $100,000 before any individual charger is installed, plus roughly $2,000 per charger. That is an industry view rather than a quote for any particular building, and costs vary a lot with the age and layout of the property, but it shows why committees tend to ask who is paying before they ask anything else.
Options a committee may weigh include the requesting owner paying for their own charger and a separate meter or sub-meter, or the body corporate funding shared infrastructure through the long-term maintenance fund or a levy, with users charged for the electricity they use. A long-term maintenance plan is also the natural place to put a charging upgrade if the building has no spare capacity.
A tenant should ask the landlord before arranging anything, and the landlord in turn needs the body corporate's agreement if common property is involved. Start with a short written request that states what is being installed, who will do the work and who pays for what. A landlord who cannot obtain consent may have to wait for a building-wide decision.